New Drilling Rig Construction

New construction of drilling rigs on crawler chassis or trucks for various drilling methods and applications.

With our years of experience, you can only benefit from working with us on the construction of a new drilling rig. We offer the following options:

  • Design of drilling rigs (support from the initial inquiry to the offer, ordering, through to acceptance and handover)
  • Or complete new design and manufacturing at our facility

We offer drilling rigs for a wide variety of applications:

  • Drinking water supply
  • Irrigation purposes
  • Groundwater lowering
  • Seismic surveys
  • Exploration / Reconnaissance
  • Directional drilling of all types
  • Explosive ordnance disposal (EOD) surveys

The following drilling methods can be performed with our systems:

  • Flush drilling
  • Air-lift drilling
  • Suction drilling
  • Down-the-hole hammer drilling
  • Dry drilling
  • Hammer drilling
  • Core drilling
  • Directional drilling of all kinds

Custom construction of new drilling rigs

Do you have an absolutely specialized application or a project for which no “off-the-shelf” drilling rig is suitable?

We design custom systems for every conceivable application!

Contact us!

foratron GmbH
Drilling Rig Services and Solutions

Elwerathstraße 2
D-29336 Nienhagen

T +49(0)5085 – 98 15 09 -0
F +49(0)5085 – 98 15 09 -1
info@foratron.de

We are always there for our customers: 24 hours a day – 7 days a week.

Your contacts:

Stephan Einax: +49(0)5085 – 98 15 09-2
Christian Price: +49(0)5085 – 98 15 09-4

Current New Drilling Rigs

Here you will find current examples of new drilling rig construction

Copyright: foratron GmbH | Germany